Quick answer
To compare 3PL SLA results, keep input, format and settings fixed and change one variable. SLAs should cover ship time, inventory accuracy, damage rate, returns turnaround and credits.
Why it matters
Changing several variables at once makes results unattributable.
Define measurement method.
Step by step
- Calculate order volume, SKU count, average units and return rate.
- Get itemized rates: receiving, storage, pick/pack, packaging, shipping, returns and minimums.
- Run a real 30-day order sample through cost per order, not just the pick fee.
- Include peak surcharges, system fees, long-term storage and contract term.
Common mistakes
- Comparing only pick/pack and ignoring storage and minimums.
- Using average volume instead of peak volume.
- Ignoring returns processing and long-term storage.
- No SLA, credits or exit terms in the contract.
Checklist
- Quote itemizes receiving, storage, pick/pack, packaging, shipping and returns.
- Minimums, system fees, peak surcharges and long-term storage are explicit.
- Includes inventory accuracy, ship-time and credit SLAs.
- Supports my SKU sizes, temperature and hazmat needs.
- Contract term, price increases and exit/data migration are clear.
Key facts
- Define measurement method.
- Read liability caps.
- Peak SLAs may differ.
FAQ
How do I compare two 3PL SLA results?
To compare 3PL SLA results, keep input, format and settings fixed and change one variable. SLAs should cover ship time, inventory accuracy, damage rate, returns turnaround and credits.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: Extensiv