Before Switching 3PL, back up the original, confirm format/size/quality requirements and close programs that lock the file. Switching 3PL requires inventory migration, system cutover, labels, SLAs and customer communication to avoid stockouts.
Why it matters
Poor preparation leads to overwrites, failures and rework.
Count inventory during migration.
Step by step
- Calculate order volume, SKU count, average units and return rate.
- Get itemized rates: receiving, storage, pick/pack, packaging, shipping, returns and minimums.
- Run a real 30-day order sample through cost per order, not just the pick fee.
- Include peak surcharges, system fees, long-term storage and contract term.
Common mistakes
- Comparing only pick/pack and ignoring storage and minimums.
- Using average volume instead of peak volume.
- Ignoring returns processing and long-term storage.
- No SLA, credits or exit terms in the contract.
Checklist
- Quote itemizes receiving, storage, pick/pack, packaging, shipping and returns.
- Minimums, system fees, peak surcharges and long-term storage are explicit.
- Includes inventory accuracy, ship-time and credit SLAs.
- Supports my SKU sizes, temperature and hazmat needs.
- Contract term, price increases and exit/data migration are clear.
Key facts
- Count inventory during migration.
- Run systems in parallel.
- Read exit terms first.
FAQ
How should I prepare before Switching 3PL?
Before Switching 3PL, back up the original, confirm format/size/quality requirements and close programs that lock the file. Switching 3PL requires inventory migration, system cutover, labels, SLAs and customer communication to avoid stockouts.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: Extensiv